Restructuring of the former HSBC building into an office and service building for DIOR
-Reinforcement of floors above ground level and removal of intermediate loadbearing members.
-Increase in ceiling heights by optimising downstand beams.
-Creation of an auditorium and plant spaces in basements.
-Creation of a sixth-floor roof terrace and a glazed structure in the courtyard with terrace on first floor.
-Creation of dormers in the roof space and repair of the timber frame and refurbishment of the roofcovering.