Thermal renovation of buildings 13 and 14, as well as staff accommodation at the Renée Bonnet high school.
On the second floor of building 13, a metal structure is constructed on the south facade in addition to the building’s external insulation, enabling the creation of a covered passageway on the ground floor and the addition of glass sunbreakers to the above-ground storeys.