Structure and MEP Engineering from Concept through to Detailed Design with Site Supervision.
Construction of a new City Hall that concentrates all municipal departments at a site located on the banks of the Lez River. It includes the creation of a plaza and public park, the construction of a 560-space underground parking garage and a 140-space surface parking lot.