The construction of a Primary School, Secondary School and Sports Hall forming a single Academy within the Queen Elizabeth Olympic Park. The Primary School building is a steel frame structure with pre-cast concrete planks on a piled foundation with suspended ground floor slab. The Secondary School has a reinforced concrete frame structure using flat slab construction and the Sports Hall has a steel frame over a reinforced concrete podium.
The building design allows for the future expansion of the school and the project is targeting BREEAM excellent certification.
All design was produced in Revit 2016.