The construction of a Primary School, Secondary School and Sports Hall forming a single Academy within the Queen Elizabeth Olympic Park. The Primary school building is a steel frame structure with pre-cast concrete planks on a piled foundation with suspended ground floor slab.
The Secondary School is a reinforced concrete frame using flat slab construction and the Sports Hall is a steel frame over a reinforced concrete podium.
The building design allows for the future expansion of the school and the project is targeting BREEAM excellent certification.
All design was produced in Revit 2016